File #: 26-7443    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/29/2026 In control: Commissioners Court
On agenda: 11/12/2026 Final action: 11/12/2026
Title: Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC, in the amount of $1,264,784.60 for Professional Engineering and related services in connection with Road Improvements - Fallbrook Dr. - From Huffmeister Rd to 600' West of Winter Wind Blvd - 2026, UPIN 26103D1Y1B01, Precinct 3, MWBE Contracted Goal: 3%.
Sponsors: Mony Hossain
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 26103D1Y1B01
Vendor/Entity Legal Name (if applicable): Pape-Dawson Consulting Engineers, LLC

MWBE Contracted Goal (if applicable): 3%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC, in the amount of $1,264,784.60 for Professional Engineering and related services in connection with Road Improvements - Fallbrook Dr. - From Huffmeister Rd to 600' West of Winter Wind Blvd - 2026, UPIN 26103D1Y1B01, Precinct 3, MWBE Contracted Goal: 3%.
end

Background and Discussion:

Precinct 3 is requesting the Office of the County Engineer to approve an agreement to provide professional engineering services for the design of a 4-lane concrete boulevard, in a 100-foot ROW with raised median and underground storm sewer system on Fallbrook Drive, from Huffmeister Road to 600' West of Winter Wind Boulevard. The design includes a bridge over HCFCD Unit #E133-01-00, the second half of the boulevard, from the HCFCD Unit #E133-00-00 to the existing portion of Fallbrook Drive (west of Winter Wind Boulevard), and 5' wide sidewalk on both sides of the boulevard within the project limits.

Expected Impact:

The design will improve vehicular and pedestrian connectivity for the communities along the roadway.

Alternative Options:

The alternative is for the existing 2-lane concrete r...