Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy, LLC and authorize the County Auditor to pay monthly bills for 10610 1/2 Hufsmith Rd Tomball, TX 77375 for electrical power serving a traffic signal, Hufsmith Rd at FM 2978, Stuebner Airline Rd, & Kuykendahl Rd, UPIN 24103MF34P03, Precinct 3.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 24103MF34P03
Vendor/Entity Legal Name (if applicable): CenterPoint Energy, LLC

MWBE Contracted Goal (if applicable): %
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy, LLC and authorize the County Auditor to pay monthly bills for 10610 1/2 Hufsmith Rd Tomball, TX 77375 for electrical power serving a traffic signal, Hufsmith Rd at FM 2978, Stuebner Airline Rd, & Kuykendahl Rd, UPIN 24103MF34P03, Precinct 3.
end

Background and Discussion:
This traffic signal will be part of this project which consists of realignment and intersection improvements for the Stuebner Airline at Hufsmith Road Intersection.

Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy to establish electrical service to the permanent traffic signal, which is needed to enhance the operation of the intersection of Hufsmith Rd at Stuebner Airline.


Alternative Options:
All traffic signals require a power source, which is typically obtained through CenterPoint Energy. Alternative options are to place a generator, which is not reliable, or not installed/remove the traffic from the intersection. Both options pose a public safety concern and will impact the operation and increase delay of the intersection.