Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): UPIN 19101MF17F01; Job No. 25/0039
Vendor/Entity Legal Name (if applicable): All-Terra Engineering, Inc.
MWBE Contracted Goal (if applicable): 100% - MWBE/SBE/HUB/DBE
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with All-Terra Engineering, Inc. in the amount of $91,217.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Parkway (Mobile Homes – 2018) Subdivision Drainage Improvements, UPIN 19101MF17F01, Precinct 1, MWBE Contracted Goal: 100%, MWBE Current Participation: 100%.
end
Background and Discussion:
The Parkway (Mobile Homes) Subdivision is located in Precinct 1, northeast Harris County, north of the intersection of Park Trail Drive and Tidwell Road. The existing drainage system consists of concrete curb and gutter, and surface flow to a main trunkline drainage culvert that runs south and ultimately outfalls into HCFCD maintained ditch P122-00-00. The scope of project includes construction of underground drainage improvements, stormwater detention basin, and concrete pavement. All-Terra Engineering will provide construction materials testing services to support the project in construction.
Expected Impact:
This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the m...
Click here for full text