Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a joint use agreement with Texas Department of Transportation (TxDOT) to establish joint access within TxDOT right-of-way, allowing the Flood Control District to perform construction and permanent maintenance (Addicks Reservoir Watershed, Project ID U501-07-00-E002, CDBG-MIT, Agreement No. 2026-105, Precinct 4).
end
Background and Discussion:
This agreement will allow access for both construction and permanent maintenance operations of Basin West 3. The Stormwater Detention Basins on South Mayde Creek Near the Grand Parkway – Phase 1 (Project) has recently commenced construction. The Project is located west of Grand Parkway, North of Clay Road, south of Stockdick School Road, east of Peek Road, and within Harris County Precinct 4. The objective of the Project is to maximize stormwater storage capacity and reduce flood risk along South Mayde Creek (Unit ID: U101-00-00).
The Project will include construction of two wet-bottom compartments (West 2 and West 3) with gravity-only outfalls and overflow spillways into South Mayde Creek. Access to West 3 will come via Clay Road, with permanent access through TxDOT right-of-way, a CenterPoint easement, and a low-water crossing at the U201-09-00 channel. An Agreement has been prepared by the County Attorney...
Click here for full text