File #: 26-7026    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/12/2026 In control: Commissioners Court
On agenda: 10/29/2026 Final action: 10/29/2026
Title: Request for approval to execute an agreement with InfraTECH Engineers & Innovators, LLC. in the amount of $501,406.28 for professional engineering services in connection with Study and Design of Frick Road Sidewalk from Ann Louise Road to Veterans Memorial Drive –2026, UPIN 2610229PXB01, Precinct 2, MWBE Contracted Goal: 20.00%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 2
Secondary Department Head/Elected Official: Adrian Garcia, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 2610229PXB01
Vendor/Entity Legal Name (if applicable): InfraTECH Engineers & Innovators, LLC

MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with InfraTECH Engineers & Innovators, LLC. in the amount of $501,406.28 for professional engineering services in connection with Study and Design of Frick Road Sidewalk from Ann Louise Road to Veterans Memorial Drive –2026, UPIN 2610229PXB01, Precinct 2, MWBE Contracted Goal: 20.00%.
end

Background and Discussion:
Harris County Precinct 2 (PCT2) has requested that the Harris County Engineering Department (HCED) prepare the Study and Design of Frick in Harris County, Texas, Precinct 2. This project consists of Constructing a sidewalk spanning approximately 1.2 miles from Ann Louise Rodd to West of Veterans Memorial Drive along Frick Road. This project will include Drainage Analysis, Survey, Geotechnical, SUE, Environmental, and Tree Protection Plan for the project area.


Expected Impact:
This project seeks to enhance safe access to Doss Park and surrounding facilities by improving pedestrian connectivity from surrounding neighborhoods. The Goal of the project is to improve overall pedestrian access to Doss Park.


Alternative Options: No viable alternative exists, if no action is taken, the project may experience delays...

Click here for full text