Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Supplemental RCA
Type of Request: Contract - Award
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): Texas Water Development Board (TWDB)
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval of a grant agreement with the Texas Water Development Board, in the amount of $2,500,000, to fund the Halls Aldine Westfield South Stormwater Detention Basin and Mainstem Channel Conveyance Improvements in the Halls Bayou Watershed (Agreement No. 2026-112, Precinct 2).
end
Background and Discussion:
This agreement will fund the Halls Aldine Westfield South Stormwater Detention Basin & Mainstem Channel Conveyance Improvements in the Halls Bayou Watershed. The 89th Texas Legislature allocated funds in Senate Bill 1 to the Harris County Flood Control District. Senate Bill 1 was signed by the Governor on June 22, 2025, and will be effective on September 1, 2025. This allocation from the Texas Legislature is being obtained through the Texas Water Development Board. The project in Senate Bill 1 is the Halls Aldine Westfield South Stormwater Detention Basin & Mainstem Channel Conveyance Improvements in the Halls Bayou Watershed.
Expected Impact:
This agreement would fund feasibility, preliminary engineering, and design. The feasibility, preliminary engineering report, and design will determine the ultimate benefits provided. The proposed P118-00-00 Halls Aldine Westfield South Stormwater Detenti...
Click here for full text