Title: Request for approval of change in contract No. 2 with Environmental Allies Inc., for the Brookglen Stormwater Detention Basin – Phase 2, (Armand Bayou Watershed, Bond ID C-06, Project ID B512-02-00-E002, Job No. 25/0353, Precinct 2, MWBE Contracted Goal: 27.26%, MWBE Current Participation: 18.50%).
Attachments: 1. 101526 CIC 2 ENV ALLIES B512-02-00-E002 PCT 2 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): B512-02-00-E002
Vendor/Entity Legal Name (if applicable): Environmental Allies, Inc.

MWBE Contracted Goal (if applicable): 27.26%
MWBE Current Participation (if applicable): 18.50%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 2 with Environmental Allies Inc., for the Brookglen Stormwater Detention Basin – Phase 2, (Armand Bayou Watershed, Bond ID C-06, Project ID B512-02-00-E002, Job No. 25/0353, Precinct 2, MWBE Contracted Goal: 27.26%, MWBE Current Participation: 18.50%).
end

Background and Discussion:
This change in contract is needed to complete the construction contract for this project. The Brookglen Stormwater Detention Basin (SWDB) (HCFCD Unit B512-00-00-E002) project site consists of excavating the three compartments of a stormwater detention basin bounded by Somerton Drive to the west, Ashwyne Lane to the north, CenterPoint Energy property with high voltage transmission facilities to the east, and a transmission line property to the south, within the City of La Porte, Texas. The scope of work includes the off-site disposal of approximately 45,157 cubic yards of excavated material to facilitate the construction of a dry-bottom stormwater detention basin. The basin will be divided into three compartments to mitigate potential conflicts with an existing 30-inch natural gas transmission line. Additionally, the project includes the demolition and removal of existing pavement as part of the decommis...