Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Choose an item.
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report by Woolpert dated February 2026, and titled Halls Bayou, Hardy West Stormwater Detention Basin and Channel Improvements (Halls Bayou Watershed, Bond ID C-41, Project ID P518-15-00-E001, Precinct 2).
end
Background and Discussion:
The purpose of this transmittal is to request the acceptance of the summary of scope changes since the Preliminary Engineering Report (PER) titled Halls Bayou, Hardy West Stormwater Detention Basin (SWDB) and Channel Improvements Unit No. P118-00-00 to continue with the full implementation of the project. This project is generally located along Halls Bayou between West Hardy Road and Airline Drive approximately 1.5 miles in northern Harris County. The purpose of this project is to improve drainage conditions along HCFCD Unit No. P118-00-00 (Halls Bayou) within the project location and to mitigate flood risks in the study area. The project started under the leadership of Lockwood, Andrews, & Newnman (LAN) with the Engineer of Record being Woolpert where the project had reach 90% completion. The leadership was then changed from LAN to Quiddity, under the direction of the HCFCD project management team. Multiple questions arose through these changes which led to the discovery of...
Click here for full text