Title: Request for approval of a change in contract with Statewide Traffic Signal Company, in connection with final construction of Intersection Improvements - Hufsmith Rd at FM 2978, Stuebner Airline Rd, & Kuykendahl Rd-PhaseII-2024, adding 60 calendar days, with a deduction in the amount of $126,493.80, Job No. 23/0341-1, UPIN 24103MF34P02, Precinct 3, MWBE Contracted Goal: 8.60%, MWBE Current Participation: 11.74%.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 23/0341, UPIN 24103MF34P02
Vendor/Entity Legal Name (if applicable): Statewide Traffic Signal Company

MWBE Contracted Goal (if applicable): 8.60%
MWBE Current Participation (if applicable): 11.74%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Statewide Traffic Signal Company, in connection with final construction of Intersection Improvements - Hufsmith Rd at FM 2978, Stuebner Airline Rd, & Kuykendahl Rd-PhaseII-2024, adding 60 calendar days, with a deduction in the amount of $126,493.80, Job No. 23/0341-1, UPIN 24103MF34P02, Precinct 3, MWBE Contracted Goal: 8.60%, MWBE Current Participation: 11.74%.
end

Background and Discussion:
This On-Call project involves modifying an existing traffic signal located at the intersection of Kuykendahl Rd. and Hufsmith. This On-Call project consisted of the modification of an existing traffic signal system with appropriate pedestrian facilities that includes upgrades to ADA ramps, converting eastbound lanes to dedicated left, shared thru-left, and dedicated right turn lane with 150 ft storage; provide a dedicated southbound right turn lane with 200 ft storage; striping, signage improvements at the intersection of Kuykendahl Rd and Hufsmith, Precinct 3. This project was completed to enhance and provide a reliable and safe route of transportation to the residents of Harris County at the existing intersection. The project was overseen by Harr...