Legislation Details

File #: 26-5829    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 9/2/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Request for approval to execute an agreement with MBCO Engineering, LLC, in the amount of $116,659.25 to provide Professional Engineering Services in connection with Birnam Wood Boulevard - Segment 1, UPIN 20104MF1BG01, Precinct 3, MWBE Contracted Goal: 20%.
Attachments: 1. Award-20104MF1BG01-Birnam Wood-MBCO-P3-9.17.26.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 20104MF1BG01
Vendor/Entity Legal Name (if applicable): MBCO Engineering, LLC

MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with MBCO Engineering, LLC, in the amount of $116,659.25 to provide Professional Engineering Services in connection with Birnam Wood Boulevard - Segment 1, UPIN 20104MF1BG01, Precinct 3, MWBE Contracted Goal: 20%.
end

Background and Discussion:
This project will facilitate Extending Birnam Wood Blvd., from 450' north of Hickorygate Dr to south of J109-01-01-2019. Upgrades from 2-lane concrete 1/2 boulevard section to 4-lane concrete curb and gutter boulevard with 32' raised median within a 100' ROW.

Expected Impact:
The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with surrounding projects, contributing to the overall development and sustainability of the area.

Alternative Options:
If no action is taken, the prime consultant will not be able to proceed with Construction Phase Services, and this location will continue operating under existing conditions.

County Strategic Plan Goal: 2. Connect our com...