Legislation Details

File #: 26-5154    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/23/2026 In control: Commissioners Court
On agenda: 8/6/2026 Final action: 8/6/2026
Title: Request for approval of a change in contract with SER Construction Partners LLC, in connection with Tower Oaks Meadows Subdivision Drainage Improvements - 2018, deducting 98 calendar days, with an addition in the amount of $250,000.00, Job No. 25/0186-01, Mobility Fund, UPIN 19103MF12K01, Precinct 3, MWBE Contracted Goal: 21.93%, MWBE Current Participation: 43.43%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 25/0186, UPIN 19103MF12K01
Vendor/Entity Legal Name (if applicable): SER Construction Partners LLC

MWBE Contracted Goal (if applicable): 21.93%
MWBE Current Participation (if applicable): 43.43%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with SER Construction Partners LLC, in connection with Tower Oaks Meadows Subdivision Drainage Improvements - 2018, deducting 98 calendar days, with an addition in the amount of $250,000.00, Job No. 25/0186-01, Mobility Fund, UPIN 19103MF12K01, Precinct 3, MWBE Contracted Goal: 21.93%, MWBE Current Participation: 43.43%.
end


Background and Discussion:
The project area is located in the Northwest area bounded by Barwood Subdivision on the North, N Eldridge Pkwy on the East, Fallbrook Dr on the South, and Marrs Dr on the West. The subdivision is specifically bounded on the West by HCFCD Unit E133-00-00, on the East by HCFCD Unit E132-00-00. The Tower Oaks Meadows Subdivision primarily served by roadside ditch drainage systems that are directed East to N Eldridge Pkwy, West to HCFCD Unit E133-00-00 and North to an existing storm sewer within a back lot easement on the common line between Tower Oaks Meadows and Barwood Subdivision. The scope of work for this project consists of storm sewer improvements by regrading ditches and providing additional capacity underneath ditches to accommodate for increased conveyance, and full roadway reconstruc...

Click here for full text