Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0358, UPIN 19101MF14202
Vendor/Entity Legal Name (if applicable): SER Construction Partners LLC
MWBE Contracted Goal (if applicable): 26.94%
MWBE Current Participation (if applicable): 39.42%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with SER Construction Partners LLC, in connection with Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, deducting 46 calendar days, with an addition in the amount of $231,000.00, Job No. 24/0358-01, Grant Fund, UPIN 19101MF14202, Precinct 2, MWBE Contracted Goal: 26.94%, MWBE Current Participation: 39.42%.
end
Background and Discussion:
Pine Trails Subdivision is in Northeast Harris County, Texas, Precinct 2 (redistricted from Precinct 1). Phases 1 and 2 are located on the Northwest and Southwest side of the Pine Trails subdivision respectively. The subdivision consists of approximately 525 acres and 1,800 homes. The residents have experienced structural flooding during several recent flood events. Approximately 264 homes were reported to have flooded during Hurricane Harvey. Proposed improvements include an upgraded storm sewer system and two detention basins. This contract includes construction services for the construction phase.
The change in contract includes the following:
Add new line items to the project for completion of the proposed scope of work.
New Line Items:
? Added a new line item number 212 fo...