Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0227, UPIN 19103MF12H01
Vendor/Entity Legal Name (if applicable): CE Barker, Ltd
MWBE Contracted Goal (if applicable): 22.07%
MWBE Current Participation (if applicable): 9.80%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with CE Barker Ltd., in connection with Barwood Subdivision Drainage Improvements - 2018, with an addition in the amount of $261,096.64, Job No. 25/0227-01, UPIN 19103MF12H01, Precinct 3, MWBE Contracted Goal: 22.07%, MWBE Current Participation: 9.80%.
end
Background and Discussion:
The project is located in northwest Harris County in the White Oak Bayou watershed. Barwood consists of a curb and gutter with storm sewer drainage system that drains into HCFCD channels E132-00-00 and E133-00-00. The proposed improvements increase the size and capacity of the storm sewer system within the neighborhood with mitigation provided by the E132-00-00-00 Mitigation Project along the E132-00-00 channel and internal mitigation for improvements draining to E133-00-00. The scope and proposed improvements include storm sewer improvements, road reconstruction, replacement of driveways and driveway culverts. Improvements will comply with Harris County standards.
The change in contract includes the following:
The line items are adjusted to reconcile overrun quantities and add new line items to the project for completion of the proposed scope of work.
? The increase of qu...