Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Utility Agreement
Project ID (if applicable): UPIN 19101MF14G01-2
Vendor/Entity Legal Name (if applicable): ExxonMobil Pipeline Company LLC (EMPCo)
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute a Utility Agreement with ExxonMobil Pipeline Company LLC (EMPCo) to construct a road repaving of Redbird Ln to match current existing elevation across its pipeline easement at Lat/Long: 29.840, -95.221 in connection with Houmont Park Subdivision Drainage Improvements - 2018 (P117-00-00) - 2018, UPIN 19101MF14G01-2, Precinct 1.
end
Background and Discussion:
This project generally seeks to reduce flooding and strengthen resilience in Harris County by assisting in the alleviation of structural flood damage to homes in the Houmont Park Subdivision.
Expected Impact:
This utility agreement specifically will allow Harris County to construct a road repaving of Redbird Ln to match current existing elevation in Houmont Park Subdivision. No impact on project schedule or staffing anticipated.
Alternative Options:
Re-design options were already evaluated during the study and design phases, and re-evaluating them again at this stage is not feasible given the project cost and schedule.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition an...
Click here for full text