Legislation Details

File #: 26-5005    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 7/21/2026 In control: Commissioners Court
On agenda: 8/6/2026 Final action: 8/6/2026
Title: Request for approval to execute an Interlocal Agreement with the City of Houston to construct drainage, roadway, and public safety improvements in and around the Alief Forest South community, UPIN 261046PHLC01, Precinct 4.
Attachments: 1. 26-5005-ILA-261046PHLC01-Alief Forest South Community-COH-P4-8.6.26.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Commissioner, Lesley Briones

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): UPIN 261046PHLC01
Vendor/Entity Legal Name (if applicable): City of Houston

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an Interlocal Agreement with the City of Houston to construct drainage, roadway, and public safety improvements in and around the Alief Forest South community, UPIN 261046PHLC01, Precinct 4.
end

Background and Discussion:

The Alief Forest South neighborhood has suffered numerous FEMA repetitive loss properties and widespread flooding during Hurricane Harvey. Approximately two-thirds of roadway surfaces are in poor or worse condition, and sidewalks do not meet ADA or City IDM standards. Water lines were installed in the mid-1980s require replacement and reconnection to nearby main. Sanitary sewer lines are also aging and require replacement.

Expected Impact:

These drainage improvements will protect 577 households, improve access and emergency response during storm events, and provide a 25-year level of protection for the neighborhood. Reconstructed pavement will reduce vehicle wear and improve travel safety, while rebuilt sidewalks with ADA-compliant ramps and upgraded streetlights will enhance multimodal access, visibility, and overall neighborhood safety.

Alternative Options:

There are no alternative options; if not approved, it may res...

Click here for full text