Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Commissioner Tom S. Ramsey, P.E.
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): 23103MF2P601
Vendor/Entity Legal Name (if applicable):Weisser Engineering Company Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by Weisser Engineering Company Inc for Boudreaux Road Segment 4 - from 200' east of Hufsmith-Kohrville Road to 700' south of SH-99, UPIN 23103MF2P601, Precinct 3.
end
Background and Discussion:
This project consists of upgrading Boudreaux Road Segment 4 to a standard 4-lane concrete boulevard in 100-foot ROW with 32-foot raised median and underground storm sewer system. Transition from existing 20-foot raised median to a 32-foot-wide median south of SH-99 along Gleannloch Forest Drive. Project includes 5ft Sidewalks along the south & east ROW, widen the existing BNSF Railroad at-grade crossing to accommodate a standard 4-lane concrete boulevard with a raised 32' median and a 5' sidewalk on the south Right of Way and drainage improvements.
Expected Impact:
The project will improve the vehicular mobility for the local community, and the Safer for pedestrians.
Alternative Options:
Without this project, this road segment will continue operating under the current conditions without the improved 4 lane configuration.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-mai...