File #: 26-4996    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 7/21/2026 In control: Commissioners Court
On agenda: 8/6/2026 Final action: 8/6/2026
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 24407 1/2 Birnam Wood Blvd, Spring, TX 77373 for electrical power serving a traffic signal, Birnam Wood Blvd Segment 1 - from 450' north of Hickorygate Dr to south of J109-01-01 - 2019, UPIN 20104MF1BG01, Precinct 3.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 20104MF1BG01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

MWBE Contracted Goal (if applicable): %
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 24407 1/2 Birnam Wood Blvd, Spring, TX 77373 for electrical power serving a traffic signal, Birnam Wood Blvd Segment 1 - from 450' north of Hickorygate Dr to south of J109-01-01 - 2019, UPIN 20104MF1BG01, Precinct 3.
end

Background and Discussion:
This traffic signal will be part of this project which consists of extending Birnam Wood Blvd., from 450' north of Hickorygate Dr to south of J109-01-01, Upgrade from 2-lane concrete 1/2 boulevard section to 4-lane concrete curb and gutter boulevard with 32' raised median within a 100' ROW. The service outlet location statement is needed to establish electrical service from Center Point Energy to power the new traffic signal on Birnam Wood Blvd at Lincolns Meadow Dr.

Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy to establish electrical service to the permanent traffic signal, which is needed to enhance the operation of the intersection of Birnam Wood Blvd at Lincolns Meadow Dr.



Alternative Options:
All traff...