Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Commissioner, Lesley Briones
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): UPIN 25104MF3WJ01
Vendor/Entity Legal Name (if applicable): Harris County Municipal Utility District No. 346
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an Interlocal Agreement with Harris County Municipal Utility District No. 346 for the design and construction of sidewalk improvements in and around Green Trails and Heatherwood Park, UPIN 25104MF3WJ01, Precinct 4.
end
Background and Discussion:
HCFCD completed a desilting project in 2021 to restore storage capacity in the two drainage channels (T101-00 and T101-01) that serve as linear detention basins. In the process, the concrete sidewalks were heavily damaged This project is for repairs to an existing Hike and Bike trail in the limits of HC MUD 346.
Expected Impact:
Improvements to existing public amenities by replacing the existing sidewalks with ADA accessible trails will create a safer environment for children and those that may require additional safety measures. A wide asphalt trail will allow bikers and pedestrians to share the path and greatly reduce the threat of accidents and collisions.
Alternative Options:
There are no alternative options; if not approved, it may result in delays.