Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Marcus Stuckett, P.E., CFM Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): 14104MF08X01
Vendor/Entity Legal Name (if applicable): Not applicable
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request that the County Judge execute a Cross Conveyance and Correction Special Warranty Deed for Harris County Flood Control District, a political subdivision of the State of Texas and the County of Harris, a body politic and corporate under the laws of the State of Texas for the public project known as Treaschwig Rd A (Phase 1)-from 1,000 ft West of Aldine Westfield Rd to West of Cypress Creek, tract numbers 1, 2 & 3, UPIN 14104MF08X01, Precinct 3.
end
Background and Discussion:
The Flood Control District conveyed 12.12 acres to Harris County out of a previously acquired 15.21 acres. The parcels were intended to support the construction of the Treaschwig Road detention basin and a future parking lot and small trailhead.
The original detention basin layout for Treaschwig Road Phase 1 changed due to Atlas 14 rainfall data as well as an increased requirement for floodplain fill mitigation. The change in the basin footprint resulted in a need for additional property beyond what was originally conveyed from the Flood Control District to Harris County. Therefore in 2024, an additional 12.9 acres were conveyed from the Flood Control District to H...
Click here for full text