Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 23103MF2QZ01
Vendor/Entity Legal Name (if applicable): Scientech Engineers, Inc.
MWBE Contracted Goal (if applicable): 23%
MWBE Current Participation (if applicable): 15%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Scientech Engineers, Inc in the amount of $90,012.00, for professional engineering services in connection with South Diamondhead Blvd - from 500-ft West of Sea Palms Dr. to West of Boom Dr. - 2022, UPIN 23103MF2QZ01, Precinct 3, MWBE Contracted Goal: 23%, Current MWBE Participation: 15%.
end
Background and Discussion:
Construct the remaining two eastbound lanes of four lane boulevard with asphalt pavement and monolithic concrete curb and gutter. Mill and overlay existing the existing westbound lanes. Construct a two- lane westbound bridge over Gum Gully. The amendment includes separating the project into two phases.
Conduct the study and design of a standard four (4) lane concrete boulevard. The goal of studying and designing South Diamondhead Blvd, from 500-ft West of Sea Palms Dr. to West of Boom Dr., is to expand the existing 2-lane half-boulevard roadway to a 4-lane concrete full boulevard and improve mobility in the area.
Expected Impact:
The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved dr...