Legislation Details

File #: 26-4746    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 7/15/2026 In control: Commissioners Court
On agenda: 7/30/2026 Final action: 7/30/2026
Title: Request for approval of an award on the basis of low bid to Juan & Son Contracting LLC in the amount of $493,225 for construction of the Meyergrove Stormwater Detention Basin - Phase 2 - for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260145), MWBE Contracted Goal: 29%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Marcus Stuckett

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 260145
Vendor/Entity Legal Name (if applicable): Juan & Son Contracting LLC

MWBE Contracted Goal (if applicable): 29%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to Juan & Son Contracting LLC in the amount of $493,225 for construction of the Meyergrove Stormwater Detention Basin - Phase 2 - for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260145), MWBE Contracted Goal: 29%.
end

Background and Discussion:
The project scope entails the design and construction of an approximately 8 acre-ft wet-bottom stormwater detention basin at Braeswood Blvd and Frankway Drive on a City of Bellaire tract within the City of Houston jurisdiction. The proposed basin will contribute to flood risk reduction in the Braeswood Blvd corridor. The project entails design, construction, turnover and startup. The Flood Control District is coordinating with the City of Bellaire to acquire an easement to construct and maintain the project. The project is funded by left over FEMA grant from the adjacent Meyergrove Detention basin.

Expected Impact:
This project seeks to reduce street flooding risk in the Braeswood Blvd corridor along Brays Bayou (D100-00-00) within the Brays Bayou watershed.

Alternative Options:
The alternative to this item would be that the low bidder will not be accepted, which would result in increas...

Click here for full text