Title: Request for approval of an amendment to an agreement with Vogler & Spencer Engineering, Inc. in the amount of $23,320.00, for Professional Engineering and related services in connection with Cutten Rd - from south of Bavaria Dr to Cossey Rd - 2019, UPIN 20104MF1C801, Precinct 3, MWBE Contracted Goal: 2.05%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): 20104MF1C801
Vendor/Entity Legal Name (if applicable): Vogler & Spencer Engineering, Inc.

MWBE Contracted Goal (if applicable): 2.05%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Vogler & Spencer Engineering, Inc. in the amount of $23,320.00, for Professional Engineering and related services in connection with Cutten Rd - from south of Bavaria Dr to Cossey Rd - 2019, UPIN 20104MF1C801, Precinct 3, MWBE Contracted Goal: 2.05%.
end

Background and Discussion:
Extension of Cutten Road from Magnolia Ridge Drive to Cossey Road, standard four (4) lane concrete boulevard in 100-ft right of way with 32-ft raised medians including 5-ft sidewalks to both sides of the extension of Cutten Rd up to Spring Cypress Road, the tie-in of existing sidewalks south of Bavaria Dr., and a proposed detention pond southeast of the Cutten/Cossey intersection. This amendment will separate the south basin design and bid phase to expedite the construction schedule to meet terms of an interlocal agreement.

Expected Impact:
The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with s...