File #: 26-4620    Version: 1 Name:
Type: Contract - Renewal Status: Agenda Ready
File created: 7/9/2026 In control: Commissioners Court
On agenda: 7/21/2026 Final action:
Title: Request for approval of a renewal option and to correct the vendor name from ECON Development, Inc. (as approved) to LASS Engineering and Construction, Inc. (corrected) for general drainage system repairs in South Harris County for the Flood Control District for the period of September 1, 2026 - August 31, 2027, at a cost of $6,000,000, and for the County Clerk to execute any applicable bonds to be received (250003), MWBE Contracted Goal: 18.58%, MWBE Current Participation: 100%.
Attachments: 1. 26-4620 Correction and Renewal Job No. 250003 - LASS Engineering and Construction, Inc
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Marcus Stuckett

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Renewal

Project ID (if applicable): 250003
Vendor/Entity Legal Name (if applicable): LASS Engineering and Construction, Inc. (corrected) ECON Development, Inc. (as approved)

MWBE Contracted Goal (if applicable): 18.58%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of a renewal option and to correct the vendor name from ECON Development, Inc. (as approved) to LASS Engineering and Construction, Inc. (corrected) for general drainage system repairs in South Harris County for the Flood Control District for the period of September 1, 2026 - August 31, 2027, at a cost of $6,000,000, and for the County Clerk to execute any applicable bonds to be received (250003), MWBE Contracted Goal: 18.58%, MWBE Current Participation: 100%.
end

Background and Discussion: Click or tap here to enter text.
The Project consists of General Repairs, for sites located throughout the southern portions of Harris County, Texas. Major emphasis of this Repair Contract will continue to be earthwork, including but not limited to erosion repair, slope failure repair, removal and disposal of sediment accumulations, granular fill and riprap installation, pipe removal and replacement, headwall and wingwall removal and replacement, concrete channel lining removal and replacement, concrete low-flow removal and replacement, outfall structure removal and replacement and related items. These services will provide support for infrastructure maintenance work