Legislation Details

File #: 26-4592    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 7/7/2026 In control: Commissioners Court
On agenda: 7/21/2026 Final action:
Title: Request for approval of a change in contract with Reliance Construction Services, LP, in connection with final construction of Water Distribution System - Berwyn Drive - 2024, with a deduction in the amount of $241,293.11, Job No. 24/0430-2, UPIN 24289MF3JQ01, Precinct 2, MWBE Contracted Goal: 22.74%, MWBE Current Participation: 100%.
Attachments: 1. CIC-24289MF3JQ01-Berwyn Drive-24-0430-2.Final-Reliance Constr-P2-07212026.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 24/0430, UPIN 24289MF3JQ01
Vendor/Entity Legal Name (if applicable): Reliance Construction Services, LP

MWBE Contracted Goal (if applicable): 22.74%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
...title
Request for approval of a change in contract with Reliance Construction Services, LP, in connection with final construction of Water Distribution System - Berwyn Drive - 2024, with a deduction in the amount of $241,293.11, Job No. 24/0430-2, UPIN 24289MF3JQ01, Precinct 2, MWBE Contracted Goal: 22.74%, MWBE Current Participation: 100%.
...end

Background and Discussion:
The project consists of installing a water distribution system to serve Berwyn Drive. in Precinct 2 of Harris County. The water distribution system includes the installation of waterline along Berwyn Drive, water service connections to existing residences and the decommissioning of existing wells. Over all 33 Connection Expected is completed. This change in contract includes:

PCO#2 - Final Quantity adjustment - $-241,293.11

Expected Impact:
This action allows for the completion of the project as designed and per the contract documents, the Contractor to be compensated for the actual work performed and return the unused fund to Harris County.

Alternative Options:
Continue with the original plan.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-mainta...