Legislation Details

File #: 26-4587    Version: 1 Name:
Type: Interlocal Agreement Status: Agenda Ready
File created: 7/7/2026 In control: Commissioners Court
On agenda: 7/21/2026 Final action:
Title: Request for approval of an amendment to an agreement with NWHCMUD No. 5 for design, construction and maintenance responsibilities for the Rocchi Road from 345' west of Toto Dell Way to 275' east of Toto Dell Way, UPIN 26103MF3ZY01, Precinct 3.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): UPIN 26103MF3ZY01
Vendor/Entity Legal Name (if applicable): NWHCMUD No. 5

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with NWHCMUD No. 5 for design, construction and maintenance responsibilities for the Rocchi Road from 345' west of Toto Dell Way to 275' east of Toto Dell Way, UPIN 26103MF3ZY01, Precinct 3.
end

Background and Discussion:
The design and construction of this segment by the developer is a cost-effective way to complete a missing segment of roadway, which will provide a continuous connection between two major thoroughfares. Funding this section during the development of an adjacent subdivision, the County benefits residents by providing a cost-effective project that will be delivered faster than a traditional design-bid-build project.

Expected Impact:
Rocchi Road between Telge Rd and Grant Rd will be complete and allow for more efficient travel for residents.

Alternative Options:
The County could elect to design, bid, and build this section of roadway, but at a longer duration and higher cost.


County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.