Legislation Details

File #: 26-4504    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/26/2026 In control: Commissioners Court
On agenda: 8/6/2026 Final action: 8/6/2026
Title: Request for approval of an amendment with MC2 Civil, LLC for construction of Fellows Road at Beltway 8 Improvements project, as part of Barrier-Free HCTRA program in the amount of $190,000.00 (Precinct 1; MWBE Contract Goal: 23.63%).
Primary Department: Toll Road Authority
Primary Department Head/Elected Official: Roberto Trevi?o, P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): 25/0171
Vendor/Entity Legal Name (if applicable): MC2 Civil, LLC

MWBE Contracted Goal (if applicable): 23.63%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment with MC2 Civil, LLC for construction of Fellows Road at Beltway 8 Improvements project, as part of Barrier-Free HCTRA program in the amount of $190,000.00 (Precinct 1; MWBE Contract Goal: 23.63%).
end

Background and Discussion:
On October 30, 2025, the Commissioners Court approved a request for a construction contract award to MC2 Civil, LLC for construction of Fellows Road at Beltway 8 Improvements project, as part of Barrier-Free HCTRA program in the amount of $1,534,703.50. The Fellows Road at Beltway 8 Improvements project provides ADA and pedestrian-accessibility near HCTRA's Sam Houston Toll Road.

This request is to add a temporary signal and replacement of the VIVDS camera system at this location for an increase of $190,000 with an updated total contract value of $1,724,703.50. The original scope of work only included replacement of VIVDS cable while leaving the existing VIVDS cameras in place. After discussion with TXDOT and the manufacturer, it was determined that the whole system will need to be replaced as the existing camera system is obsolete and the parts necessary to replace the cables are no longer manufactured.




Expected Impact:
The temporary traffic signals will reduce signal d...