Legislation Details

File #: 26-4464    Version: 1 Name:
Type: Grant Status: Passed
File created: 6/26/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request by the Office of the County Engineer for approval to accept from the Texas Water Development Board grant funds in the amount of $8,494,368.75, with a required match of $2,998,393.25, for the Federal Emergency Management Agency Flood Mitigation Assistance, Bear Creek Village Subdivision Drainage Improvements project.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant - Award

Project ID (if applicable): 25208MF3V101 (UPIN)
Vendor/Entity Legal Name (if applicable): Federal Emergency Management Agency (FEMA) via Texas Water Development Board (TWDB)
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): 0%
Justification for 0% Grant Indirect Costs Rate (if applicable): Infrastructure (Design, Construction, Maintenance)

Request Summary (Agenda Caption):
title
Request by the Office of the County Engineer for approval to accept from the Texas Water Development Board grant funds in the amount of $8,494,368.75, with a required match of $2,998,393.25, for the Federal Emergency Management Agency Flood Mitigation Assistance, Bear Creek Village Subdivision Drainage Improvements project.
end

Background and Discussion:
The Bear Creek Village Subdivision is 675 acres generally bound by Clay Road to the south, State Highway 6 to the west, Addicks Satsuma Road to the north, and the Addicks Reservoir to the east. The structures in the subdivision have suffered repetitive flood losses. Most recently, during Hurricane Harvey, 1,396 structures were flooded. Prior to that, the Tax Day flood in April 2016 flooded 306 structures. Drainage problems within the Bear Creek Village Subdivision primarily result from ponding areas where the storm sewer system is inadequate to collect and drain extreme event runoff. Drainage analysis has shown that street regrading and storm sewer replacement, in addition to channels in the reservoir, will provide the optimal reduction in flooding for the subdivision. The TWDB grant a...