Title: Request for approval of an amendment to an agreement with Agha Engineering, LLC, in the amount of $2,767,903.08, for engineering services to provide design, bidding, and construction phase services in support of Phase 3 and 4 of the Keegans Bayou Stormwater Detention Basin, HCFCD Unit D518-03-00 (Brays Bayou Watershed, Bond ID F-07, Project ID D518-03-00-E004, Agreement No. 2024-24, Precinct 4, MWBE Contracted Goal: 19.90%, MWBE Current Participation: 23.16%).
Attachments: 1. 070926 AMEND AGHA 2024-24 PCT 4 backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): D518-03-00-E004
Vendor/Entity Legal Name (if applicable): Agha Engineering, LLC

MWBE Contracted Goal (if applicable): 19.90%
MWBE Current Participation (if applicable): 23.16%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Agha Engineering, LLC, in the amount of $2,767,903.08, for engineering services to provide design, bidding, and construction phase services in support of Phase 3 and 4 of the Keegans Bayou Stormwater Detention Basin, HCFCD Unit D518-03-00 (Brays Bayou Watershed, Bond ID F-07, Project ID D518-03-00-E004, Agreement No. 2024-24, Precinct 4, MWBE Contracted Goal: 19.90%, MWBE Current Participation: 23.16%).
end

Background and Discussion:
This project will provide flood damage reduction benefits to the upper and middle reaches of Keegans Bayou and was identified as a recommended project in the Keegans Bayou Watershed Planning Study. The project includes the design and construction of the Keegans Bayou Stormwater Detention Basin and associated channel improvements along HCFCD Unit D118-14-00. Construction is anticipated to occur in two separate construction phases. This item is requested to allow the selected consultant to continue advancing the design of the proposed improvements.

Expected Impact:
Under ultimate conditions, the project will provide approximately 437 acre-feet of detention storage near HCFCD Unit D118-14-00 and Keegans Bayou (HCFCD Unit D118-00-0...