Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): O100-00-00-E003
Vendor/Entity Legal Name (if applicable): Carollo Engineers, Inc.
MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 24.73%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an agreement with Carollo Engineers, Inc., in the amount of $1,615,237.80, to provide design and construction phase services of the Goose Creek Channel Conveyance Improvements and Rollingbrook Stormwater Detention Basin and preliminary engineering for the Northern Segment-Stage 1 (Goose Creek Watershed, Bond ID F-120, Project ID O100-00-00-E003, Agreement No. 2026-11, Precinct 2, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 24.73%).
end
Background and Discussion:
This Agreement provides design and construction-phase services for the Goose Creek Channel Conveyance Improvements and the Rollingbrook Stormwater Detention Basin (Southern Segment), as well as a Preliminary Engineering Analysis for the Northern Segment (Stage 1). For the Southern Segment, the scope includes improving channel conveyance capacity, designing a stormwater detention basin (SWDB) to reduce flooding, addressing encroachments, and relocating the existing waterline. For the Northern Segment, the scope includes a two-stage analysis to evaluate hydraulic benefits, determine detention volume needs, assess alternative site locations, and develop conceptual high-level engineering deliverables.
Expected Impact:
The pro...