Legislation Details

File #: 26-4395    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/25/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval of amendment No. 2 to an agreement with Othon, Inc., in the amount of $142,171.54, to provide additional design, bidding, and construction phase engineering services in support of drainage improvements in the Morningside Place Subdivision (Clear Creek Watershed, Bond ID F-01, Project ID A135-01-00-E001, Agreement No. 2020-197, Precinct 1).
Attachments: 1. 070926 AMEND OTHON 2020-197 PCT 1 backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): A135-01-00-E001
Vendor/Entity Legal Name (if applicable): Othon, Inc.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of amendment No. 2 to an agreement with Othon, Inc., in the amount of $142,171.54, to provide additional design, bidding, and construction phase engineering services in support of drainage improvements in the Morningside Place Subdivision (Clear Creek Watershed, Bond ID F-01, Project ID A135-01-00-E001, Agreement No. 2020-197, Precinct 1).
end

Background and Discussion:
The Morningside Place Subdivision is a single-family development with an amenity lake serving as a stormwater detention facility. The Subdivision is located east of HCFCD Unit A135-00-00, which connects to Clear Creek. Based on residents' complaints about street and roadway flooding, the Flood Control District's drainage studies identified drainage improvements to reduce flood risk in the subdivision.

The project includes right-of-way acquisition, design, and construction of street drainage conveyance improvements on A135-00-00. This project is being funded as part of the 2018 Bond Program in partnership with HCWCID89. The project is now in the final design stage and is expected to move to construction shortly.

This final design phase includes revisions and preparation of Phase 2 bidding and construction plans and specifications, sur...