Legislation Details

File #: 26-4363    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 6/24/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval to execute an interlocal agreement with the City of Houston for design, construction, and maintenance of new water lines on Clinton Drive 13,000 feet west from EWPP continuing onto Mascot St, and on Mayo Shell Road from Clinton Road to 4,000 feet south, Precinct 2.
Attachments: 1. ILA-NS102-Precinct 2 NSMA Agmt -COH-P2-7.9.26-Agmt
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 2
Secondary Department Head/Elected Official: Adrian Garcia, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): NS102
Vendor/Entity Legal Name (if applicable): City of Houston

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an interlocal agreement with the City of Houston for design, construction, and maintenance of new water lines on Clinton Drive 13,000 feet west from EWPP continuing onto Mascot St, and on Mayo Shell Road from Clinton Road to 4,000 feet south, Precinct 2.
end

Background and Discussion:
The Permanent Utility is the installation of 24-inch and 16-inch waterlines along Clinton Drive. This is the result of a City of Houston Project (Large Diameter Water Line & Valve Replacement - Package 3, WBS No. S-000701-0038-3) to assess and rehabilitate or replace a 96-inch water line which runs along Clinton Drive and replace a 12-inch water line along Mayo Shell Road.

Expected Impact:
These proposed improvements would reduce maintenance, improve water flow, pressure and quality within the segment.

Alternative Options:
The alternative would be to reject this interlocal agreement, leaving the county to provide the improvements line at a later time, when resources become available.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condit...

Click here for full text