Legislation Details

File #: 26-4182    Version: 1 Name:
Type: Public Necessity Status: Passed
File created: 6/23/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, eight (8) road easement & two (2) temporary construction easement tracts for the public project known as Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, for the purpose of roadway construction, UPIN 20104MF1BH01, Precinct 3.
Attachments: 1. (PN)20104MF1BH01-BirnamWoodSeg2-P3-7-9-26.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

Project ID (if applicable): 20104MF1BH01
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, eight (8) road easement & two (2) temporary construction easement tracts for the public project known as Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, for the purpose of roadway construction, UPIN 20104MF1BH01, Precinct 3.
end

Background and Discussion:
This project expands Birnam Wood Boulevard from south of HCFCD Unit No. J109-01-01 to Cypresswood Drive from an existing two-lane concrete half-boulevard to a full boulevard section. Improvements include adding two southbound lanes constructed of concrete, a 32 foot grass median, a new southbound bridge at the J109-01-01 channel, southbound left turn lanes at Fern Hill Drive and Battle Spring Drive, sidewalks on both sides of Birnam Wood Boulevard, and a new traffic signal at Fern Hill Drive. Improvements to existing sections of Birnam Wood Boulevard include left turn lanes at Cypresswood Drive, Goldspring Lane, North Spring Drive, Allyson Lane, Green Lodge Circle, and Fern Hill Drive, as well as...

Click here for full text