Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: Not Applicable
Regular or Supplemental RCA: Regular RCA
Type of Request: Financial Authorization
Project ID (if applicable): 23103MF2QF01
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder
MWBE Contracted Goal (if applicable): Not Applicable
MWBE Current Participation (if applicable): Not Applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not Applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Telge Rd Segment 5 - from 1,780-ft North of Telge Ranch Rd to 300-ft North of Grant Rd - 2014, tract 60, for $135,000.00 which is $19,588.00 over the appraised value, UPIN 23103MF2QF01, Precinct 3.
end
Background and Discussion:
The project involves the construction of a 4 lane Boulevard with storm drain, curb and gutter, and sidewalks. In order to achieve the desired result, additional land is needed for road ROW, a detention basin, and also for temporary drainage easements outside the road ROW. The temporary drainage easements will be used to construct shallow swales outside the road ROW, so as to not block drainage on private property. If and when the adjacent property is developed, the temporary drainage easements will no longer be needed and can be vacated.
Expected Impact:
The project will address current and future traffic volumes, reduce delays, and provide safe mobility for residents, pedestrians, and drivers.
Alternative Options:
If no action is taken, there will be delays in area mobility improvement.