Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0315, UPIN 25102MF3P601
Vendor/Entity Legal Name (if applicable): Queen Construction, LLC
MWBE Contracted Goal (if applicable): 25.49%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Queen Constructors, LLC., in connection with BS2N North and South Silver Green Drive - 2024, adding 45 calendar days, with an addition in the amount of $400,845.00, Job No. 25/0315-1, UPIN 25102MF3P601, Precinct 2, MWBE Contracted Goal: 25.49%.
end
Background and Discussion:
Project includes Repair and replacement of damaged concrete pavement, curbs, driveways, sidewalks and other related items on the N &S Silver Green Dr in Harris County Precinct 2. The Precinct has requested the repair of additional damaged panels and ramps that are not captured in the current scope of work.
Expected Impact:
Change allows the contractor to conform with the Precinct's vision for the BetterStreets2Neighborhoods Community Program.
Alternative Options:
Maintain the original scope of the project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A