Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0017, UPIN 24102MF3B401
Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.
MWBE Contracted Goal (if applicable): 21.66%
MWBE Current Participation (if applicable): 99.32%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Hayden Paving, Inc., in connection with BS2N Hardy/Aldine - 2024, with an addition in the amount of $1,208,508.65, Job No. 25/0017-1, UPIN 24102MF3B401, Precinct 2, MWBE Contracted Goal: 21.66%, MWBE Current Participation: 99.32%.
end
Background and Discussion: The project consists of rehabilitating various asphalt and concrete roadways located within the Hardy/Aldine area of Harris County Precinct 2. The work includes milling and overlaying existing asphalt pavement, performing required base repairs, and applying prime coat, tack coat, and dense-graded surface overlays across the full roadway width. The project also includes full-depth concrete pavement repairs, restoration of a smooth riding surface, and installation of new pavement striping.
This Change Order is associated with PCO-1 and addresses the overrun quantities resulting from the additional roadway length incorporated into the project scope at the request of Precinct 2. Per direction from the Precinct, the Contractor has been requested to perform milling, and asphalt overlay for approximately 2.75 additional miles of roadway beyond the original project limits. This additional w...