File #: 26-3622    Version: 1 Name:
Type: Report Status: Passed
File created: 5/28/2026 In control: Commissioners Court
On agenda: 6/11/2026 Final action: 6/11/2026
Title: Request for approval of a Study Report prepared by InfraTECH Engineers & Innovators, LLC, for roadway widening, bridge widenings, sidewalk installations and street lighting along Fairmont Parkway (Segment 2 - 700' west of Canada Drive to Underwood Road), UPIN 24102MF3KK01, Precinct 2.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): UPIN: 24102MF3KK01
Vendor/Entity Legal Name (if applicable): InfraTECH Engineers & Innovators, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by InfraTECH Engineers & Innovators, LLC, for roadway widening, bridge widenings, sidewalk installations and street lighting along Fairmont Parkway (Segment 2 - 700' west of Canada Drive to Underwood Road), UPIN 24102MF3KK01, Precinct 2.
end

Background and Discussion:
Fairmont Parkway Segment 2 is part of a five-segment project that includes constructing an additional outside lane in each direction, repairing and/or overlaying of existing pavement, adding new sidewalks and improving drainage. The project also includes widening of the Spring Gully (B109-00-00) bridges to accommodate the additional lanes and pedestrian traffic. A portion of the project is in the City of La Porte.

Expected Impact:
This project seeks to improve transportation and pedestrian mobility by improving road conditions to enhance traffic flow and provide smoother and safer travel for motorists, while also creating a pedestrian-friendly environment by constructing sidewalks, promoting active transportation, and improving overall pedestrian access.




Alternative Options:
If no action is taken, the area will continue to realize traffic delays and impacts on mobility.