Legislation Details

File #: 26-3620    Version: 1 Name:
Type: Report Status: Passed
File created: 5/28/2026 In control: Commissioners Court
On agenda: 6/11/2026 Final action: 6/11/2026
Title: Request for approval of a Study Report prepared by HR Green, Inc. for Corridor Study - Wallisville Road from Normandy Street to Uvalde Road, UPIN 23102MF2UM01, Precinct 2.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 2
Secondary Department Head/Elected Official: Adrian Garcia, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): UPIN 23102MF2UM01
Legal Vendor/Entity Name (if applicable): HR Green Inc.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by HR Green, Inc. for Corridor Study - Wallisville Road from Normandy Street to Uvalde Road, UPIN 23102MF2UM01, Precinct 2.
end

Background and Discussion: The project is in east Harris County in the Houston area, Precinct 2. The project reconstructs Wallisville Rd from Normandy St to Uvalde Rd with concrete pavement, a dedicated left turn lanes, curb and gutter, sidewalks on both sides, storm sewers, water, bridge, and traffic signals.

Expected Impact: Approval of this study report will enable HR Green, Inc. to proceed into the design phase of the pavement widening and drainage improvement of Wallisville Rd from Normandy St to Uvalde Rd in Harris County

Alternative Options: The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county's transportation network in alignment with the County's Vision Zero plan.
Ju...