Legislation Details

File #: 26-3619    Version: 1 Name:
Type: Report Status: Passed
File created: 5/28/2026 In control: Commissioners Court
On agenda: 6/11/2026 Final action: 6/11/2026
Title: Request for approval of a Study Report provided by Kuo & Associates Inc. for Northpointe Boulevard Segment 1 - from Grant Rd to Shaw Rd - 2019, UPIN 20104MF1BP01, Precinct 3.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): 20104MF1BP01
Vendor/Entity Legal Name (if applicable): Kuo & Associates Inc

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of a Study Report provided by Kuo & Associates Inc. for Northpointe Boulevard Segment 1 - from Grant Rd to Shaw Rd - 2019, UPIN 20104MF1BP01, Precinct 3.
end

Background and Discussion:
This project is located at Northpointe Boulevard in Precinct 3 and is adjacent to other capital improvement projects.

Expected Impact:
This Study Report will provide the necessary information to proceed with the proposed road improvement project which consists of a 4-lane concrete boulevard in a 100-foot ROW with a 32-foot raised median, underground storm sewer, detention mitigation, sidewalks and parallel bridges over Faulkey Gully.

Alternative Options:
The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.




County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county's transportation network in alignment with the County's Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County's commitme...

Click here for full text