Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0101, UPIN 22289MF29P01
Vendor/Entity Legal Name (if applicable): Reliance Construction Services, LP
MWBE Contracted Goal (if applicable): 23.13%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
...title
Request for approval of a change in contract with Reliance Construction Services, LP, in connection with final construction of Water Distribution System - Parkwood Estates Ph 4 Olana Dr - 2022, with a deduction in the amount of $75,770.10, Job No 24/0101-4, UPIN 22289MF29P01, Precinct 2, MWBE Contracted Goal: 23.13%, MWBE Current Participation: 100%.
...end
Background and Discussion:
The project consists of installing a water distribution system to serve Olana Drive in Precinct 2 of Harris County. The water distribution system includes the installation of waterline along Olana Drive, water service connections to existing residences and the decommissioning of existing wells. Over all 88 Connection Expected is completed
This change in contract includes:
PCO#4 - Final quantities adjustment. -$75,770.1
Expected Impact:
This action allows unused funds to be returned to Harris County and allows the Contractor to be compensated for the work performed
Alternative Options:
Continue with the original plan.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.