Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): 260071
Vendor/Entity Legal Name (if applicable): Brice Highway LLC
MWBE Contracted Goal (if applicable): 23.24%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG-DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis lowest priced proposal meeting requirements to Brice Highway LLC in the amount of $52,745,087 for Dinner Creek Stormwater Detention Basin - Phase 1 for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260071), MWBE Contracted Goal: 23.24%.
end
Background and Discussion:
The Dinner Creek Stormwater Detention Basins project is nearing the end of the Design stage. It is planned as a single-phase project to increase the storage capacity within the existing stormwater detention basin compartments located east of Greenhouse Road on Dinner Creek, a tributary of Langham Creek in the Addicks Reservoir watershed, in northwest Harris County.
Presently, the Dinner Creek Stormwater Detention Basin site consists of three (3) compartments that have partially been excavated as dry-bottom basins. Two (2) utility easements containing multiple pipelines and aerial electrical towers cross the site and essentially divide the site with a fourth compartment being added on the northeast part of the site. These util...