Legislation Details

File #: 26-3089    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 5/3/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval to execute an interlocal agreement with Union Pacific Railroad Company for the installation of a 6" potable water line encased in steel sleeve at the existing railroad ROW to serve Edgewater Park, UPIN 23103MF2VZ01, Precinct 3.
Sponsors: Mony Hossain
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): 23103MF2VZ01
Vendor/Entity Legal Name (if applicable): Union Pacific Railroad Company

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an interlocal agreement with Union Pacific Railroad Company for the installation of a 6" potable water line encased in steel sleeve at the existing railroad ROW to serve Edgewater Park, UPIN 23103MF2VZ01, Precinct 3.
end

Background and Discussion:
The proposed park features include a boat ramp, parking lots, access roads, two prefabricated restrooms with six stalls each, a playground, hike and bike trails throughout the park, detention ponds, a pedestrian bridge over a wetland pond, and a fishing pier. The regional trail is to connect the Spring Creek Greenway at US-59 to the west and the Kingwood Greenbelt/Bike Route System at Ross Road to the east, utilizing the recreational easement to cross beneath the Union Pacific Railroad trestle bridge. Water, sanitary sewer, and electrical for the park features are to connect to the existing and proposed utilities that run along Hamblen Road

Expected Impact:
Improvements to the land with proposed park and recreational features for the community.

Alternative Options:
There are no alternative options.



County Strategic Plan Goal: 2. Connect our community with safe, reliable, equ...

Click here for full text