Legislation Details

File #: 26-3002    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/1/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval to execute an agreement with Isani Consultants, L.P. in the amount of $1,207,027.00 for Professional Engineering Services in connection with Walters Road Improvement from Spears Road to Gears Road, UPIN 25101MF3WN01, Precinct 1, MWBE Contracted Goal: 19.87%.
Sponsors: Mony Hossain
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Rodney Ellis, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 25101MF3WN01
Vendor/Entity Legal Name (if applicable): Isani Consultants, L.P.

MWBE Contracted Goal (if applicable): 19.87%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Isani Consultants, L.P. in the amount of $1,207,027.00 for Professional Engineering Services in connection with Walters Road Improvement from Spears Road to Gears Road, UPIN 25101MF3WN01, Precinct 1, MWBE Contracted Goal: 19.87%.
end

Background and Discussion:
Walters Road from Spears Road to Gears Road, a 1.3-mile segment in North Houston. Walters Road is a 2-lane asphalt collector, within 60-70 ft of right-of-way (ROW) with open ditches on both sides, overhead utilities, and a culvert channel crossing. The project's primary objective is to perform study and design to improve the existing roadway to a precinct preferred 3-lane (2 travel lanes with continuous turn lane) configuration, with 6-8ft wide sidewalks on each side of the road.

Expected Impact:
Provide enhanced mobility for pedestrian and vehicular traffic along Waters Road within project limits.

Alternative Options:
No alternative options. If not approved, project will be delayed or cancelled.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective...

Click here for full text