Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): W140-00-00-X013
Vendor/Entity Legal Name (if applicable): Greater Houston Construction
MWBE Contracted Goal (if applicable): 19.84%
MWBE Current Participation (if applicable): 91.49%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 1 with Greater Houston Construction, for concrete channel lining repairs (Buffalo Bayou Watershed, Bond ID CI-018, Project ID W140-00-00-X013, Job No. 25/0066, Precinct 3, MWBE Contracted Goal: 19.84%, MWBE Current Participation: 91.49%).
end
Background and Discussion:
This change in contract is needed to complete the construction contract for this project. The purpose is to
increase the quantities for the 6-inch and 8-inch concrete channel lining items to replace additional sections as
required, and to extend the 48-inch reinforced concrete pipe to the manhole. Additionally, the weep holes from Station 34+40 to Station 44+00 within the low-flow channel require cleaning to restore proper function and improve efficiency.
Expected Impact:
This change will allow the contractor to construct the project so that Harris County can realize intended flood risk reduction benefits.
Alternative Options:
This is an active construction contract, so there are not many alternatives to approving a change order other than cancelling the contract, which is not recommended as doing so would substantially delay the remaining work in the construction contract.