Legislation Details

File #: 26-2876    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 4/29/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval to execute an agreement with B2Z Engineering, LLC, in the amount of $441,508.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Bear Creek Village Subdivision Drainage Improvements - 2018 Stage B, UPIN 25208MF3V101, Precinct 4, MWBE Contracted Goal: 100%.
Attachments: 1. 26-2876-Award-25208MF3V101-BearCreekVillSub.DrainImprov-B2Z Engineer-P4-5.14.26
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Leslie Briones, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 25208MF3V101; Job No. 26/0097
Vendor/Entity Legal Name (if applicable): B2Z Engineering

MWBE Contracted Goal (if applicable): 100%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with B2Z Engineering, LLC, in the amount of $441,508.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Bear Creek Village Subdivision Drainage Improvements - 2018 Stage B, UPIN 25208MF3V101, Precinct 4, MWBE Contracted Goal: 100%.
end

Background and Discussion:

The Bear Creek Village Subdivision is 675 acres generally bound by Clay Road to the south, State Highway 6 to the west, Addicks Satsuma Road to the north, and the Addicks Reservoir to the east. The structures in the subdivision have suffered repetitive flood losses. Most recently, during Hurricane Harvey, 1,396 structures were flooded. Prior to that, the Tax Day flood in April 2016 flooded 306 structures. Drainage problems within the Bear Creek Village Subdivision primarily result from ponding areas where the storm sewer system is inadequate to collect and drain extreme event runoff. Drainage analysis has shown that street regrading and storm sewer replacement, in addition to channels in the reservoir, will provide the optimal reduction in flooding for the subdivision.




Expected Impact:

This a...

Click here for full text