Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0190, UPIN 15104MF0DN05
Vendor/Entity Legal Name (if applicable): MC2 Civil, LLC
MWBE Contracted Goal (if applicable): 28%
MWBE Current Participation (if applicable): 28.25%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with MC2 Civil, LLC, in connection with final construction of Telge Rd Segment 6 - from 300-ft North of Grant Rd to 690-ft North of SH99 - 2014 Phase II, with a deduction in the amount of $20,860.66, Job No. 23/0190-2, UPIN 15104MF0DN05, Precinct 3, MWBE Contracted Goal: 28%, MWBE Current Participation: 28.25%.
end
Background and Discussion:
Project involves installation of a Right Turn Lane at the intersection of Telge Road and SH99 to accommodate commuters and reduce traffic. Changes include reconciliation of actual quantities used in construction with the estimated quantities included for bidding purposes.
- Final Adjustments -$20,860.00
Change included additional funds for the following:
-PCO-9 - Grant additional $1,698.68 for additional work, labor, time, equipment and materials not included in original scope. Concrete collar was needed to connect existing 24" RCP to proposed 24" RCP. Extra work approved per Precinct 3.
Expected Impact:
The traffic signal rebuild will improve the safety and efficiency of both pedestrian and vehicular traffic.
Alternative Options:
No alternative option, otherwise, Contractor will be delay for payment of his final pa...