Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): L100-00-00-E001
Vendor/Entity Legal Name (if applicable): GC Engineering, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report by GC Engineering, Inc., dated November 7, 2022, and titled Little Cypress Creek Channel Improvements from Confluence of Units L100-00-00 and K100-00-00 to Telge Road Crossing (Cypress Creek and Little Cypress Creek Watersheds, Bond ID F-26, Project ID L100-00-00-E001, Precinct 3).
end
Background and Discussion:
The purpose of this transmittal is to approve the Preliminary Engineering Report (PER) that was to examine potential design alternatives for the Little Cypress Creek Channel Improvements from the Confluence of Units L100-00-00 and K100-00-00 to Telge Road Crossing project. This project will add channel capacity to provide water surface elevation reduction within the Little Cypress Creek watershed. Supporting design information collected as part of the PER includes topographic survey of the basin and channels in the study area, geotechnical investigation, landscape architectural conceptual design, jurisdictional wetland delineation, cultural resources, ordinary high water mark determination, water quality, Section 404 Individual Permit application with the USACE, geomorphic assessment, and natural stable channel design verification.
Expected Impact:
...
Click here for full text