Legislation Details

File #: 26-2353    Version: 1 Name:
Type: Plat/Replat Status: Passed
File created: 4/2/2026 In control: Commissioners Court
On agenda: 4/16/2026 Final action: 4/16/2026
Title: Request for approval of the Abandonment of Flood Plain Easement as shown on the Subdivision plat of EAGLE LANDING TOWNHOMES WEST SEC 1 and the filing of this Court Order in the Real Property Records of Harris County, Precinct 1.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Plat/Replat

Project ID (if applicable):
Vendor/Entity Legal Name (if applicable): Odyssey Engineering Group, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of the Abandonment of Flood Plain Easement as shown on the Subdivision plat of EAGLE LANDING TOWNHOMES WEST SEC 1 and the filing of this Court Order in the Real Property Records of Harris County, Precinct 1.
end

Background and Discussion:
The approval is pursuant to a requirement that the applicant has met the requirements of Harris County Infrastructure Regulations, Sec 4.07 (2) which include completion of Harris County Engineer Form 1226 and provision of engineering plans and specifications that prove that the buildable area of the specific lot(s) has/have been removed from the mapped 100-year floodplain by a Letter of Map Revision (LOMR) or a Letter of Map Amendment (LOMA).

Expected Impact:
This approval will ensure that development in unincorporated areas will not pose a threat to the safety and welfare of the public as prescribed by Commissioners Court

Alternative Options:
Should Commissioners Court elect not approve this Court order then improvements will be regulated based on previous FIRM maps that the property is still located in the 100yr Flood plain.




County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Object...

Click here for full text