Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Lesley Briones
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN: 19103MF14C01
Vendor/Entity Legal Name (if applicable): BGE Inc
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of study report prepared by BGE, Inc, for Roland Road and Related Infrastructure Drainage Improvements - 2018, UPIN 19103MF14C01, Precinct 4.
end
Background and Discussion:
The project is located within the South Mayde Creek Watershed in western Harris County. The Roland Road subdivision consists of mainly roadside ditches and has been subjected to several flooding events. The scope and proposed improvements include surface collection, ditch grading and storm sewer conveyance of the drainage along Roland Road. The existing HCFCD U201-09-00 channel will be extended from Porter Road to Katy Hockley Cutoff Road to provide reduction in inundation of the subdivision.
Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This amendment is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Roland Road and Related Infrastructure project area and surrounding homeowners, Harris County, and FEMA. The fiscal impact for this project will come from the ...