Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement tract for the public project known Traffic Signal - Fallbrook Drive at Legacy Park Drive - FY23-24, for the purpose of traffic signal installation, UPIN 24035MF3GT01, Precinct 3.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

Project ID (if applicable): 24035MF3GT01
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement tract for the public project known Traffic Signal - Fallbrook Drive at Legacy Park Drive - FY23-24, for the purpose of traffic signal installation, UPIN 24035MF3GT01, Precinct 3.
end

Background and Discussion:
A traffic study was conducted for Fallbrook Drive at Legacy Park Drive, which warranted a traffic signal at the intersection. The traffic signal will enhance safety as it relates to the intersection operations. The request for acquisition of the tract would allow our contractor to conduct the necessary construction elements onto the existing property that's outside of the County's Right-of-Way.

Expected Impact:
The approval of the acquisition of the tract would allow for the designed signal elements to be properly installed at the intersection.

Alternative Options:
One alternative option is not to obtain the necessary tract. This will require extensive surveying work and redesigning the signal layout that will significantly delay the construction ...