Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0303, UPIN 24103MF3A801
Vendor/Entity Legal Name (if applicable): Forde Construction Co.
MWBE Contracted Goal (if applicable): 30.62%
MWBE Current Participation (if applicable): 16.17%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Forde Construction Co. in connection with final construction of Bridge Repair - Stuebner Airline Rd Bridge K100 - 2024, adding 1 calendar day, with an addition in the amount of $197,049.18, Job No. 24/0303-1, UPIN 24103MF3A801, Precinct 3, MWBE Contracted Goal: 30.62% MWBE Current Participation: 16.17%.
end
Background and Discussion:
Bridge Repair - Stuebner Airline Rd Bridge K100 is located at Stuebner Airline Road, crossing over Cypress Creek. The Scope of Work for this project includes, but not limited to concrete spall repairs, bearing pads replacements, erosion control and slope regrading, Guardrail repairs, concrete channel lining, removal of structural - abutment backwall at the Stuebner Airline Rd bridge over HFCD Channel K100-00-00 (Cypress Creek) within Harris County, Precinct 3.
The Changes in contract include:
* An additional quantity of 1430 Cubic Yard of borrow material is needed for the existing line item #04 to complete the work proposed in the design plan with an additional cost of $168,740.00 and zero calendar days.
* An additional quantity of 225 Linear of metal beam guard fence is needed for the existing line item #011 ...
Click here for full text